HAROPA PORT & Engie join forces to build the biggest renewable fuels platform at Le Havre, France
It's official: HAROPA PORT and Engie have signed a temporary occupation agreement for the allocation of 24 ha on the Grand Canal turnkey industrial site.
Engie, which is the winner of the call for projects launched by HAROPA PORT in march 2022, will develop 2 unique and innovative projects in the industrial port area of Le Havre.
SALAMANDRE: an industrial and commercial biomethane production unit
Using dry biomass from local wood-waste and solid recovered fuel, the unit will produce synthetic biomethane for shipping, specially for the CMA CGM (Engie’s partner).
A production of 11,000 tons a year, in the form of liquefied natural gas (LNG), is targeted. For around 60,000 tons of CO2 emissions avoided (compared with the use of fossil natural gas).
Scheduled on 2027.
KerEAUzen: an e-kerosene, e-naphtha and e-hydrogen unit
Engie is also involved in the France KerEAUzen project, a synthetic fuels production unit for air transport and green chemistry. It will produce e-kerosene, e-naphtha and e-hydrogen obtained from renewable hydrogen produced by a 250 MW electrolysis unit and CO₂ captured on the industrial port area, thanks to the SALAMANDRE’s project.
Annual kerosene production will approximately reach 70,000 tons per year by combining recycled local CO₂ and renewable hydrogen. On average, 270,000 tons of CO₂ from SALAMANDRE and local manufacturers will be recycled each year.
For this project, ENGIE is partnering Air France, which will be the main consumer for its Roissy Charles de Gaulle and Orly airports.
Categories
Investments
2023-01-01
at Port of Le Havre (FR)Latest news
thyssenkrupp Uhde selected for Elyse Energy’s Biomass-to-SAF project in France
Elyse Energy BioTJet project© Elyse Energy. Proven PRENFLO® gasification turns biomass into valuable syngas for Sustainable Aviation Fuel (SAF)
BASF commissions 54-megawatt water electrolyzer at it's Ludwigshafen site
BASF SE, Ludwigshafen →Annual capacity of up to 8,000 metric tons of hydrogen. Key step in the ramp-up of products with a reduced carbon footprint. direct integration of the technology into a chemical production environm...
Moeve and Exolum invest close to 300 million euros in new infrastructure at the Port of Huelva to help drive the energy transition
The companies announce the construction of new loading and unloading facilities that will connect to the upcoming 2G biofuel plant, set to become the largest 2G biofuel complex in Southern Europe
Técnicas Reunidas will carry out the engineering services to develop one of Europe’s largest green methanol plant
The facility, with a production capacity of 140,000 tons per year, will combine biogenic carbon from a biomass cogeneration plant with renewable hydrogen to produce renewable methanol.