Europe’s first hydrogen fuelled power plant supporting the UK’s decarbonisation at Essars refinery in Stanlow, UK
Stanlow, UK – Essar Energy Transition (EET) today announces the launch of EET Hydrogen Power, Europe’s first hydrogen-ready combined heat and power plant (CHP) to be built at its Stanlow refinery, with the aim of completing construction in 2027. The investment will support EET Fuels’ ambition to become the lowest carbon process refinery, globally and EET Hydrogen’s ambition to become the leading low carbon hydrogen producer in the UK. It will also provide low carbon power to other industrial users in the region to support their decarbonisation targets. EET Hydrogen Power will become an independent vertical under EET.
EET Hydrogen Power will be developed over two phases to reach a capacity of 125 MW of power with 6,000 tonnes per day of steam, with the hydrogen replacing hydrocarbons delivering a reduction of 740,000 tonnes of carbon dioxide per annum. The new plant will replace Stanlow’s existing boiler units, which currently generate approximately 50MW of power for the refinery operations. The plant is integral to the decarbonisation of operations at EET Fuels’ Stanlow refinery, which plans to cut total emissions by 95% by 2030, to become the world’s lowest carbon refinery.
EET Hydrogen Power is a key infrastructure project, supporting the decarbonisation plans of the wider HyNet industrial cluster as well as forming a blueprint for future industrial and power decarbonisation. The investment also delivers on EET’s contribution in supporting and growing high skilled employment in the North West.
The investment into building Europe’s first hydrogen ready power plant is a key part of EET’s overall $3.0billion of energy transition initiatives in the North West of England.
EET includes: EET Hydrogen Power; EET Fuels (which is the owner of the Stanlow Refinery); EET Hydrogen, (which is developing 1.35+ gigawatt (GW) of blue and green hydrogen capacity for the UK market, with follow-on capacity ambition of 4GW); and Stanlow Terminals Ltd, the UK’s largest independent bulk liquid storage terminal (,which is developing enabling transport and storage infrastructure for biofuels and new energies).
Tony Fountain, Managing Partner of Essar Energy Transition, commented: “Launching EET Hydrogen Power shows the progress that Essar Energy Transition is making in delivering against its commitment to put the UK at the forefront of low carbon energy. EET Hydrogen Power helps bring this commitment to life and demonstrates our intention to globally showcase the pathway to decarbonising vital high emitting industries.”
Rob Wallace, Chief Executive Officer of EET Hydrogen Power, commented: “We have bold ambitions for Stanlow to become a low carbon transition hub at the centre of the HyNet Industrial Cluster. EET Hydrogen Power will be Europe’s first 100% hydrogen-ready gas-turbine plant which will be supplied with EET Hydrogen’s low carbon hydrogen. This project will create significant benefit by contributing to regional emissions’ reductions targets.”
Categories
Countries
Latest news
Vulcan and BASF have signed a memorandum of understanding to explore the use of geothermal energy at the Ludwigshafen site, Germany
BASF SE, Ludwigshafen →Geothermal heat to generate up to 4 million metric tons of CO2-free steam Thermal water offers opportunity for resource-efficient extraction of lithium. Regional energy suppliers investigate use o...
Exolum starts the world’s first demonstration of transport and storage of green hydrogen in existing terminal infrastructure through carrier liquids (LOHC)
The globally pioneering scheme establishes a new model for fast, flexible and efficient green hydrogen transport and storage in the UK by leveraging existing tank storage and pipeline infrastructur...
BASF to build additional production capacity for X3D® catalyst shaping technology in Ludwigshafen, Germany
BASF SE, Ludwigshafen →X3D® technology produces catalysts with optimal shapes to maximize performance and efficiency while minimizing energy consumption. Capacity needed to meet high market demand for X3D products. First...
BASF celebrates opening of new production line in Heerenveen, the Netherlands
Strategic products with a sustainable focus. Production capacity grows without additional CO2 emissions. Green electricity from wind farm Hollandse Kust Zuid joint venture